we adjusted the dispenser in front of the tip, also we create the program for top and bottom, the tip that we used is not the ideal, the fixture need a rework in the components of bottom.
We asked to the customer spec of the components to solder and de diameter of the pads. The recomended Tip without the information could be DN-20GDV14-BZ15


    • Related Articles

    • Work Instruction BTU O2 PPM Level Checks

      Work Instruction Trouble shooting High PPM levels Check that N2 Pressure is set between 55-65PSI at the internal regulator. Check flow Exceeds 450-500 LPM maintaining the above pressure (Check Default recipe notes for nominal settings) Check that ...